Completed Projects

Here is a selection of spotlight projects by
Gb Paving.

E 33rd Ave
7900 block and Harvie Rd Shoulder Stiffening

Supply and install of 140 m2 shoulder stiffening treatment Supply and install of 230 m2 asphalt restoration per SSD-G.5 local road Density testing of subbase

E 33rd Ave
72 Avenue Connector with Fraser Highway

Clearing & grubbing, 6000 m3 of excavation, 5000 tonnes of aggregates, 2200 tonnes of asphalt paving and milling, contaminated soils, traffic signals and modifications for two intersections, concrete curbs, sidewalks and driveways, 250 Lm of storm (675 diameter largest size) and drainage works, 75 Lm of Ductile Iron watermain, retaining walls, line paint and landscaping.

E 33rd Ave
Queen Elizabeth Secondary School Roadworks

Offsite roadworks and intersection upgrades on King George Blvd at 94A Avenue, including the installation of new traffic signals, asphalt and concrete removals, asphalt milling and paving, line paint, concrete curbs, sidewalks, driveways, and construction of a new median including median fencing.

E 33rd Ave
MRN Pavement Rehabilitation - Como Lake and Clarke Road

6,600 m2 of milling at depths ranging from 60mm – 150mm thick. 1400 Scope of Work tonnes of asphalt paving, manhole adjustments, line painting and road reshaping.

E 33rd Ave
2023 Road Rehabilitation Projects

23,000 m2 of milling at depths ranging from 50mm – 200mm thick. 3000 tonnes of asphalt paving, manhole adjustments, line painting and excavation, aggregates and road reshaping.

E 33rd Ave
Ranch Park Area Pavement Rehabilitation

11,200 m2 of milling at depths of 100mm thick. 2100 tonnes of asphalt paving, manhole adjustments, line painting and road reshaping.

E 33rd Ave
Sardis Secondary School Civil Early Works

185 Lm of 150mm dia watermain installation with DVCA and Meter Chambers, Storm pipe, catch basins and manhole installation, gas line replacement, 1000 m3 of excavation, 3000 tonnes of aggregates, 700 Lm of curb and gutter, hydro and tel conduit installation, 350 tonnes of asphalt paving.

E 33rd Ave
Milling and Paving Repairs (Centerm and Fraser Surrey Terminals)

50,000 m2 of milling at depths ranging from 100mm – 75mm thick. 9000 tonnes of asphalt paving.

E 33rd Ave Click Me
Moncton Road Rehabilitation (Fortis BC)

This project included 6,200 m2 of milling at a depth of 50mm for a total of 760 tonnes. This project also required line painting and manhole adjustments.

OUR IMPACT

Proven Success and Expertise

Explore our track record of excellence with key metrics showcasing our achievements. See the total number of projects completed and clients served, reflecting our commitment to quality and reliability.

10+

YEARS EXPERIENCE

20M

REVENUE GENERATED

99%

HAPPY CLIENTS

4.9

RATING